Birmingham, Alabama
MAJOR BANKING OPERATIONS CENTER
ELECTRICAL SYSTEM UPGRADE
- Electrical Construction: $5.4 million
- Ongoing
- Mission Critical
- Replaced incoming Service and essential equipment at 480 Volts. Modified new equipment to interface with essential existing systems. Reworked all critical Data Center loads to new distribution.
GENERATOR SYSTEM UPGRADE
- Electrical Construction: $1.9 million
- Mission Critical
- Added one MW self-contained generator system to existing 3 MW system. Modified paralleling system to new generator, replaced complete PLC control system, provided 5500 gallon fuel system
and reworked existing Power Monitoring and
Building Alarm system.
FIRE ALARM UPGRADE
- Electrical Construction: $620,000
- 303,000sqft
- Mission Critical
- Renovation of existing fire alarm system. Provided
state of the art multiplex fire alarm system for ADA
compliance. Supplied Strobe indication, fireman’s
phones, and voice evacuation system.